We build and maintain the infrastructure that keeps the lights on: transmission line and substation works, 33kV distribution networks, transformer installation, rural electrification, solar street lighting, solar power systems and generators, delivered for federal and state agencies and private clients.
Power projects are judged on one thing: whether the community, the estate or the facility has electricity when the contractor leaves. Our completion certificates from federal ministries and agencies say that ours do.
We handle the full chain, from 132kV line rehabilitation and 30/40MVA substations down to 500kVA/33kV transformers, LV networks and the solar street lights on the road outside. Clients get one NEMSA-certified contractor rather than three.
132kV line rehabilitation and expansion, turn-in and turn-out works, 30/40MVA substation construction and equipment installation.
33kV and 11kV lines, injection substations, distribution transformers from 300kVA to 500kVA/33kV, feeder pillars and LV networks.
Community electrification schemes for agencies and constituencies: transformers, lines, service connections and public lighting.
All-in-one and stand-alone solar street lights: supply, installation, commissioning and maintenance across towns, estates and highways.
PV systems with battery storage for offices, schools, hospitals, estates and communities, including hybrid systems with generators.
Supply and installation of prime and standby generators, soundproof canopies, changeover and synchronising panels.
Testing to standard, energisation, NEMSA-compliant certification and as-built documentation.
Scheduled maintenance, fault response, transformer servicing, oil testing and spares for networks and solar installations.
Load assessments and condition surveys for estates, facilities and communities planning upgrades.
Since 2020 we have completed eight power contracts for the Federal Ministry of Power, Works and Housing, the Rural Electrification Agency, the Energy Commission of Nigeria, the Border Communities Development Agency, three river basin development authorities and the Gombe State Ministry of Power and Energy. Every one has a completion certificate from the client.
We are certified by NEMSA to undertake electrical installation contracting works in Nigeria, and our installations are led by COREN-registered electrical engineers.
Site survey, load assessment, network conditions and the client's specification.
Single-line diagrams, equipment schedules, bill of quantities and programme.
Transformers, switchgear, poles, conductors and solar equipment from known manufacturers.
Lines, substations, transformers and lighting installed by our engineers under an HSE plan.
Tests witnessed by the client, energisation and certification.
Completion documentation, training and optional maintenance contract.
Certified complete by the client, with award and completion letters on file.
Rehabilitation and expansion of the 132kV line, turn-in and turn-out of the Dan Agundi to Dakata single-circuit line, and two 30/40MVA substations. Awarded March 2020, certified complete August 2020.
Supply, installation and energisation of 300kVA distribution transformers for communities in the local government area. Completion certified April 2021.
Provision and installation of solar street lights across selected locations, delivered in two lots for the Rural Electrification Agency.
Provision and installation of all-in-one solar streetlights in various locations, executed to specification and certified complete June 2022.
Community electrification with 500kVA/33kV transformers and associated 33kV works in three border local government areas. Completed within the contract period, December 2022.
Provision and installation of stand-alone solar powered lights under the 2022 Appropriation Act, with completion certified by the Authority.
Supply and installation of solar street lights, completed and certified by the Authority's procurement department.
Supply and installation of 500kVA/33kV transformers within an eight-week programme. Awarded November 2023, completion certified February 2024 with the comment: satisfactory.
From a constituency solar lighting scheme to a substation, send the scope and we will respond with a technical proposal.